Brio POU Dispenser Installation
Brio POU dispensers connect to a 3/8" cold water supply line (standard under-sink tap via saddle valve or angle stop tee). Installation time: 20--45 minutes. No drain line required. The dispenser requires an electrical outlet (hot/cold dispensing uses heating and cooling elements). Placement: typically countertop or adjacent to the sink counter. The supply line runs from the under-sink connection through a small hole in the cabinet bottom (or around the cabinet door) to the dispenser. Brio provides installation videos at briowater.com and customer support at 1-888-558-7873.