Standard freestanding installation
The Moen T2108 installs per standard freestanding protocol: pre-plan drain rough-in at foot end center position, finish floor, set tub, level on both axes, connect drain assembly. Moen's included drain assembly is chrome-finished and coordinates with Moen's floor-mount fillers.
Moen filler connection
Moen floor-mount fillers (Colinet, Weymouth series) connect to 1/2" hot and cold supply rough-ins at the floor. The filler ships with supply connection hardware; follow the specific filler installation guide for rough-in positioning (typically 6-10" from tub foot centerline). Moen's customer support line (1-800-289-6636) covers both tub and filler installation questions under the same account.